The gas stove installation requirements in order
1. A registered installer
The work and the certificate must come from a SAQCC Gas-registered practitioner — see SAQCC Gas and your COC.
2. Positioning and clearances
Clearance to combustible surfaces above and beside the appliance, and a stable, level base for a freestanding stove.
3. Cylinder placement
Cylinders are sited outside, upright, restrained and ventilated, clear of drains, windows and ignition sources.
4. Piping and connection
Approved pipe sized for the burner load, with the correct fitting and hose at the appliance — see gas pipework regulations.
5. Ventilation
Combustion air to the room, sized to the appliance.
6. Testing and certification
A pressure test, then a gas certificate of compliance.
Having it installed
We install hobs and stoves across Gauteng from R1,500 — see gas stove and hob installation.
Need a gas installation or a COC?
Call or WhatsApp us, or send the quote form.
